CHINZY / FDE and robotics acceptance fieldbook / 08
Distinct accepted floor area
Count each inspected and accepted patch once. Divide by the full planned area, not by the area the robot attempted.
Test setup
Use a controlled zone with a fixed surface, starting soil and cleaning criterion. Log machine operation, refilling and manual rework separately. Preserve the area definition and site photos.
Contrasting examples
Figures and IDs are illustrative fixtures, not product results or contract terms. Save inputs, versions and conditions before repeating an unexpected result.
| Example input | Expected observation |
|---|---|
planned_m2=80; accepted_A_m2=30; accepted_B_m2=20; repeated_A_m2=30 | accepted_unique_m2=50; coverage=50/80 |
planned_m2=80; scrubbed_m2=80; inspected_m2=0 | accepted_unique_m2=unverified |
Recording the result
Keep a separate row for each example; one pass cannot stand in for the other. Enter the actual output, evidence location, environment version and review decision. Leave unresolved results open.
Download test worksheet (CSV) ↓