CHINZY / FDE and robotics acceptance fieldbook / 08

Floor reopening decision

Separate cleaning completion from reopening. The site lead checks residual water and warning-removal criteria under the site procedure; do not test with pedestrians.

Test setup

Use a controlled zone with a fixed surface, starting soil and cleaning criterion. Log machine operation, refilling and manual rework separately. Preserve the area definition and site photos.

Contrasting examples

Figures and IDs are illustrative fixtures, not product results or contract terms. Save inputs, versions and conditions before repeating an unexpected result.

Example inputExpected observation
job=finished; site_signoff=pendingarea=not_released
job=finished; site_checks=passed; site_signoff=approvedarea=released

Recording the result

Keep a separate row for each example; one pass cannot stand in for the other. Enter the actual output, evidence location, environment version and review decision. Leave unresolved results open.