Skip to content
CHINZYSUPER INTELLIGENCE INFRASTRUCTURE
Console ↗

CHINZY / FDE and robotics acceptance fieldbook / 08

Effective shift rate

Divide final accepted area by total elapsed shift time including waits, water service and rework, not brush-on time alone.

Test setup

Use a controlled zone with a fixed surface, starting soil and cleaning criterion. Log machine operation, refilling and manual rework separately. Preserve the area definition and site photos.

Contrasting examples

Figures and IDs are illustrative fixtures, not product results or contract terms. Save inputs, versions and conditions before repeating an unexpected result.

Example inputExpected observation
accepted_m2=120; elapsed_min=60; brushing_min=40effective_m2_per_h=120
accepted_m2=120; elapsed_min=unknown; brushing_min=40effective_m2_per_h=unknown

Recording the result

Keep a separate row for each example; one pass cannot stand in for the other. Enter the actual output, evidence location, environment version and review decision. Leave unresolved results open.

Download test worksheet (CSV) ↓

Related project guide ↗

Download an RFQ template →