Skip to content
CHINZYSUPER INTELLIGENCE INFRASTRUCTURE
Console ↗

CHINZY / Humanoid robots

远征 A3 Ultra

Reception / Events

Compute capacity does not determine live Q&A latency. Test the proposed scripts, noise and network; record response times, wrong answers and staff handoffs.

远征 A3 Ultra
《智元智行产品手册》 · Brochure p. 11

01 / SPECIFICATIONS

Compare product specifications

Height
174 cm
Weight
60 kg
Standard runtime
8 h
Compute specification
700 TOPS

Brochure p. 11 · Specifications and images are drawn from the supplied Zhiyuan Zhixing product brochure; product names follow the brochure. Runtime, payload and options depend on configuration and test conditions.

02 / ACCEPTANCE

Proposed acceptance approach

Showrooms & brand experiences

Check routines and narration against the script. Test answer quality with an agreed question set; record response times, interaction completion and operator takeovers.

Confirm clearance, flooring, noise, audience separation and charging. Rehearse before opening; follow equipment requirements for movement and contact.

Use case ↗

03 / COMPARE

Product selection

Only identically labeled brochure measures share a row. A dash means the excerpt does not list that measure, not zero. Confirm the test conditions separately.
Compare product specifications远征 A3 UltraBrochure p. 11远征 A2 旗舰版 ↗Brochure p. 9远征 A3 ↗Brochure p. 10
Height174 cm169 cm173 cm
Weight60 kg——
Standard runtime8 h——
Compute specification700 TOPS——
Weight incl. battery—69 kg55 kg
Active degrees of freedom—40—
Continuous walking runtime—1.5 h+—
Battery capacity——1152 Wh
Combined runtime——10 h

远征 A2 旗舰版 ↗

Time walking, stationary presentations and waiting separately in a reception rehearsal. Schedule charging against the actual script; continuous-walking runtime is not an all-day event duration.

远征 A3 ↗

Mixed-use runtime is not continuous walking time. Record the fractions spent performing, waiting and walking; compare candidates using the same script.

Project consultation

This catalog is for selection, not live inventory. Pricing, delivery, configuration, development interfaces and service scope are confirmed in the written proposal.