Skip to content
CHINZYSUPER INTELLIGENCE INFRASTRUCTURE
Console ↗

CHINZY / Humanoid robots

远征 A3

Education / Events

Mixed-use runtime is not continuous walking time. Record the fractions spent performing, waiting and walking; compare candidates using the same script.

远征 A3
《智元智行产品手册》 · Brochure p. 10

01 / SPECIFICATIONS

Compare product specifications

Height
173 cm
Weight incl. battery
55 kg
Battery capacity
1152 Wh
Combined runtime
10 h

Brochure p. 10 · Specifications and images are drawn from the supplied Zhiyuan Zhixing product brochure; product names follow the brochure. Runtime, payload and options depend on configuration and test conditions.

02 / ACCEPTANCE

Proposed acceptance approach

Research & hands-on education

Use an agreed experiment checklist to verify setup, interface calls, data export and repeat runs. Deliver operating instructions, experiment records and training materials.

Confirm operating systems, languages, API permissions and shared equipment schedules. A programmable research platform does not imply ready-made algorithms.

Use case ↗

03 / COMPARE

Product selection

Only identically labeled brochure measures share a row. A dash means the excerpt does not list that measure, not zero. Confirm the test conditions separately.
Compare product specifications远征 A3Brochure p. 10灵犀 X2 ↗Brochure p. 8远征 A3 Ultra ↗Brochure p. 11
Height173 cm≈1.31 m174 cm
Weight incl. battery55 kg≈39 kg—
Battery capacity1152 Wh——
Combined runtime10 h——
Active degrees of freedom—30—
Walking runtime—≈2 h—
Weight——60 kg
Standard runtime——8 h
Compute specification——700 TOPS

灵犀 X2 ↗

Run the planned classroom movements to check access to the required joints. Active degrees of freedom are not API permissions, and walking runtime does not guarantee a full lab session.

远征 A3 Ultra ↗

Compute capacity does not determine live Q&A latency. Test the proposed scripts, noise and network; record response times, wrong answers and staff handoffs.

Project consultation

This catalog is for selection, not live inventory. Pricing, delivery, configuration, development interfaces and service scope are confirmed in the written proposal.