Mixed-use runtime is not continuous walking time. Record the fractions spent performing, waiting and walking; compare candidates using the same script.
Brochure p. 10 · Specifications and images are drawn from the supplied Zhiyuan Zhixing product brochure; product names follow the brochure. Runtime, payload and options depend on configuration and test conditions.
02 / ACCEPTANCE
Proposed acceptance approach
Research & hands-on education
Use an agreed experiment checklist to verify setup, interface calls, data export and repeat runs. Deliver operating instructions, experiment records and training materials.
Confirm operating systems, languages, API permissions and shared equipment schedules. A programmable research platform does not imply ready-made algorithms.
Only identically labeled brochure measures share a row. A dash means the excerpt does not list that measure, not zero. Confirm the test conditions separately.
Run the planned classroom movements to check access to the required joints. Active degrees of freedom are not API permissions, and walking runtime does not guarantee a full lab session.
Compute capacity does not determine live Q&A latency. Test the proposed scripts, noise and network; record response times, wrong answers and staff handoffs.
Project consultation
This catalog is for selection, not live inventory. Pricing, delivery, configuration, development interfaces and service scope are confirmed in the written proposal.