Inspection robot purchase and lease cost comparison

Compare two inspection robot offers over the same fleet size and term. Account for equipment, integration, operator time, maintenance and exit costs.

Set a common basis

Define the same route, checkpoints, payload and shifts before entering the two offers. Supply your own figures and apply the same tax basis throughout; the tool does not supply equipment prices.

The initial term is 36 months for one unit. Lease charges are per unit per month; service subscriptions are per project per month. Changing the model clears its base charge. Changing currency changes labels only: convert both offers to the same currency before entry.

Enter traceable costs

Enter 0 for a confirmed inclusion or inapplicable charge; leave unknowns blank. Owner labor is total person-hours per project month. Do not count labor already included in the subscription or support fee. Enter terminal recovery as a positive amount only with a documented valuation or contract basis.

Proposal A
Proposal B

Reconcile delivery and pricing scope

Check each item against both written offers. Reconfirm these items after changing the model, term, fleet size or cost inputs.

Budget results and difference

Term budget = upfront costs + monthly costs × months + terminal costs − terminal recovery. This constant-rate calculation excludes discounting, financing, escalation, tax-credit differences and downtime benefits. Reconcile minimum lease terms, volume tiers or downtime credits before using a monthly figure.

Budget lineA (CNY)B (CNY)
Upfront subtotal——
Monthly on-site labor——
Monthly subtotal——
Recurring cost over term——
Terminal costs——
Terminal recovery (deduct)——
Total budget over term——

A · Missing or invalid: Purchase price / unit, Extra payload, sensors and charging kit / unit (one-time), One-time delivery and integration / project, Extra consumables, energy and maintenance / unit / month, Extra software, connectivity and support / project / month, Owner’s on-site labor / person-hours per project month, On-site labor cost / person-hour, End-of-term return, removal or disposal costs / project, Expected terminal recovery or residual value / project

B · Missing or invalid: Purchase price / unit, Extra payload, sensors and charging kit / unit (one-time), One-time delivery and integration / project, Extra consumables, energy and maintenance / unit / month, Extra software, connectivity and support / project / month, Owner’s on-site labor / person-hours per project month, On-site labor cost / person-hour, End-of-term return, removal or disposal costs / project, Expected terminal recovery or residual value / project

Budget difference A − B: Pending figures

The arithmetic difference appears as soon as both sets of figures are complete. Until scope is aligned it is provisional. Checking scope never changes the calculation or the amounts.

See how each line is calculated
Purchased platforms and extra kit
(Purchase price + extra kit/unit) × units; for lease/service include only the extra kit
Delivery and integration
Whole project, once
Monthly lease or subscription
Lease: unit rent × units; service: fleet monthly fee; purchase: zero
Monthly unit operating costs
Extra unit operating cost × units
Monthly software and support
Monthly project amount
Monthly on-site labor
Monthly person-hours × hourly cost, rounded monthly to cents
Upfront subtotal
Equipment acquisition + one-time delivery and integration
Monthly subtotal
Lease or service + operations + support + on-site labor
Recurring cost over term
Monthly subtotal × months
Terminal costs
Whole project at term end
Terminal recovery (deduct)
Positive amount deducted from total; document the basis
Total budget over term
Upfront subtotal + recurring cost over term + terminal costs − terminal recovery