FDE pilot budget calculator
Estimate implementation effort, model usage and support for an enterprise AI pilot. Compare the pilot total with ongoing monthly operating costs.
Estimate a pilot budget →Compare two inspection robot offers over the same fleet size and term. Account for equipment, integration, operator time, maintenance and exit costs.
Define the same route, checkpoints, payload and shifts before entering the two offers. Supply your own figures and apply the same tax basis throughout; the tool does not supply equipment prices.
The initial term is 36 months for one unit. Lease charges are per unit per month; service subscriptions are per project per month. Changing the model clears its base charge. Changing currency changes labels only: convert both offers to the same currency before entry.
Enter 0 for a confirmed inclusion or inapplicable charge; leave unknowns blank. Owner labor is total person-hours per project month. Do not count labor already included in the subscription or support fee. Enter terminal recovery as a positive amount only with a documented valuation or contract basis.
Check each item against both written offers. Reconfirm these items after changing the model, term, fleet size or cost inputs.
Term budget = upfront costs + monthly costs × months + terminal costs − terminal recovery. This constant-rate calculation excludes discounting, financing, escalation, tax-credit differences and downtime benefits. Reconcile minimum lease terms, volume tiers or downtime credits before using a monthly figure.
| Budget line | A (CNY) | B (CNY) |
|---|---|---|
| Upfront subtotal | — | — |
| Monthly on-site labor | — | — |
| Monthly subtotal | — | — |
| Recurring cost over term | — | — |
| Terminal costs | — | — |
| Terminal recovery (deduct) | — | — |
| Total budget over term | — | — |
A · Missing or invalid: Purchase price / unit, Extra payload, sensors and charging kit / unit (one-time), One-time delivery and integration / project, Extra consumables, energy and maintenance / unit / month, Extra software, connectivity and support / project / month, Owner’s on-site labor / person-hours per project month, On-site labor cost / person-hour, End-of-term return, removal or disposal costs / project, Expected terminal recovery or residual value / project
B · Missing or invalid: Purchase price / unit, Extra payload, sensors and charging kit / unit (one-time), One-time delivery and integration / project, Extra consumables, energy and maintenance / unit / month, Extra software, connectivity and support / project / month, Owner’s on-site labor / person-hours per project month, On-site labor cost / person-hour, End-of-term return, removal or disposal costs / project, Expected terminal recovery or residual value / project
Budget difference A − B:
The arithmetic difference appears as soon as both sets of figures are complete. Until scope is aligned it is provisional. Checking scope never changes the calculation or the amounts.