Record carrier weight, load restraints and stair geometry. The brochure’s loaded runtime does not establish how long the unit can climb stairs at full payload.
Brochure p. 6 · Specifications and images are drawn from the supplied Zhiyuan Zhixing product brochure; product names follow the brochure. Runtime, payload and options depend on configuration and test conditions.
02 / ACCEPTANCE
Proposed acceptance approach
Campus & industrial inspection
Repeat agreed routes to measure checkpoint coverage, valid capture rate, reviewed anomalies and duration per run. Record manual takeovers and missed detections.
Survey steps, slopes, surfaces, connectivity and charging locations first. Ingress protection is not explosion-proof certification; special areas need a dedicated review.
Use actual cargo weight and center of gravity to test round-trip time, cargo integrity, loaded endurance and manual interventions. Log every attempt.
Include carriers and accessories in the payload. Test slopes, steps, slippery surfaces and stopping distance together; individual maximum ratings cannot be assumed simultaneously.
Only identically labeled brochure measures share a row. A dash means the excerpt does not list that measure, not zero. Confirm the test conditions separately.
The brochure distinguishes the point-foot variant’s mass and runtime with and without a load. Confirm the foot configuration, then rerun the route with the real tools and inspection stops.
Continuous walking load and maximum climbing angle are separate ratings. Test a representative slope with the proposed carrier and center of gravity; log battery use for the round trip.
Project consultation
This catalog is for selection, not live inventory. Pricing, delivery, configuration, development interfaces and service scope are confirmed in the written proposal.