CHINZY / FDE and robotics acceptance fieldbook / 07
Payload and route feasibility
Screen routes using dimensions, weight records and replayed logs first. A qualified site lead sets controlled conditions for physical trials. Do not use people or hazardous terrain to test limits.
Acceptance checks
Cargo versus total payload
Add carrier, restraints and cargo before comparing with the agreed payload for the same conditions. The empty carrier has mass.
02Load position in the fixture
Check the center of mass on the fixture drawing against the agreed envelope. Equal weight at a new position needs a new check.
03Swept envelope at a turn
Overlay the turning envelope of carrier and protruding cargo on the site plan. Straight-line clearance does not prove corner clearance.
04Outbound and return energy
Add measured outbound and return energy in the same unit and retain the agreed reserve. Outbound data alone does not establish a complete cycle.
05Destination handoff
Match the manifest, physical count and recipient acknowledgment to one trip ID. A location ping is not a handoff.
06Route revision and permitted zones
Replay the path on the approved map revision and check exclusion zones. A path valid on an older map may now be prohibited.
07Cargo condition at handoff
Compare before-and-after records for the same parcel. Without an origin record describe the observed damage without attributing it to transport.
08Dispatch cycle versus travel time
Measure from loading start until the unit is ready for the next job. Include handoff waits and empty return, not just outbound travel.